diff options
Diffstat (limited to '3472/CH43/EX43.7/Example43_7.sce')
-rw-r--r-- | 3472/CH43/EX43.7/Example43_7.sce | 33 |
1 files changed, 33 insertions, 0 deletions
diff --git a/3472/CH43/EX43.7/Example43_7.sce b/3472/CH43/EX43.7/Example43_7.sce new file mode 100644 index 000000000..2afb0db70 --- /dev/null +++ b/3472/CH43/EX43.7/Example43_7.sce @@ -0,0 +1,33 @@ +// A Texbook on POWER SYSTEM ENGINEERING
+// A.Chakrabarti, M.L.Soni, P.V.Gupta, U.S.Bhatnagar
+// DHANPAT RAI & Co.
+// SECOND EDITION
+
+// PART IV : UTILIZATION AND TRACTION
+// CHAPTER 5: ELECTRIC TRACTION-SPEED TIME CURVES AND MECHANICS OF TRAIN MOVEMENT
+
+// EXAMPLE : 5.7 :
+// Page number 782
+clear ; clc ; close ; // Clear the work space and console
+
+// Given data
+W = 203.0 // Weight of motor-coach train(tonne)
+no = 4.0 // Number of motors
+T = 5130.0 // Shaft torque(N-m)
+V_m = 42.0 // Maximum speed(kmph)
+G = 100.0/250 // Gradient
+gamma = 3.5 // Gear ratio
+n = 0.93 // Gear efficiency
+D = 91.5/100 // Wheel diameter(m)
+r = 45.0 // Train resistance(N/tonne)
+I = 10.0 // Rotational inertia(%)
+
+// Calculations
+W_e = W*(100+I)/100 // Accelerating weight of train(tonne)
+F_t = n*4*T*2*gamma/D // Tractive effort(N)
+alpha = (F_t-W*r-98.1*W*G)/(277.8*W_e) // Acceleration(km phps)
+t_1 = V_m/alpha // Time taken by train to attain speed(sec)
+
+// Results
+disp("PART IV - EXAMPLE : 5.7 : SOLUTION :-")
+printf("\nTime taken by train to attain speed, t_1 = %.1f sec", t_1)
|