summaryrefslogtreecommitdiff
path: root/416/CH5/EX5.1/5_1anspp.txt
blob: c011224fb990f3301e853ab2157c905d85447e5e (plain)
1
2
3
4
5
6
7
8
 
 solution of exp 5.1   
depreciation rate 0.024393 
 total fixed rate =0.139393
annual fixed cost of a is Rs37636089   fuel cost of plan a is Rs18000000 and total cost of a is Rs56095689
annual fixed cost of b is Rs43908771   fuel cost of plan b is Rs15750000 and total cost of b is Rs60118371
annual fixed cost of c is Rs50181453   fuel cost of plan c is Rs13500000 and total cost of c is Rs64141053
annual cost of purchasing electricty from utility is Rs600x25000+0.3x1.0e+008 is Rs45000000