summaryrefslogtreecommitdiff
path: root/3250/CH3/EX3.1/Ex3_1.txt
blob: ac4331849355778c587d31543fb2871a4f8de102 (plain)
1
2
3
4
5
6
 # PROBLEM 3.1 # 

 The final srip thickness is 4.800000 mm, 
 The avg shear yield stress during the process is 0.375000 KN/mm^2, 
 The angle subtended by the deformation zone at the roll centre is 0.077460 rad, 
 The location of neutral point is 0.022685 rad.