summaryrefslogtreecommitdiff
path: root/3472/CH24/EX24.7/Example24_7.sce
diff options
context:
space:
mode:
Diffstat (limited to '3472/CH24/EX24.7/Example24_7.sce')
-rw-r--r--3472/CH24/EX24.7/Example24_7.sce40
1 files changed, 40 insertions, 0 deletions
diff --git a/3472/CH24/EX24.7/Example24_7.sce b/3472/CH24/EX24.7/Example24_7.sce
new file mode 100644
index 000000000..73082f6ce
--- /dev/null
+++ b/3472/CH24/EX24.7/Example24_7.sce
@@ -0,0 +1,40 @@
+// A Texbook on POWER SYSTEM ENGINEERING
+// A.Chakrabarti, M.L.Soni, P.V.Gupta, U.S.Bhatnagar
+// DHANPAT RAI & Co.
+// SECOND EDITION
+
+// PART II : TRANSMISSION AND DISTRIBUTION
+// CHAPTER 17: ELECTRIC POWER SUPPLY SYSTEMS
+
+// EXAMPLE : 17.7 :
+// Page number 428
+clear ; clc ; close ; // Clear the work space and console
+
+// Given data
+V = 110.0*10**3 // Voltage(V)
+l_1 = 24.0*10**6 // Load(MW)
+t_1 = 6.0 // Time(hours)
+l_2 = 8.0*10**6 // Load(MW)
+t_2 = 6.0 // Time(hours)
+l_3 = 4.0*10**6 // Load(MW)
+t_3 = 12.0 // Time(hours)
+PF = 0.8 // Lagging power factor
+a = poly(0,'a') // Cross-section of each conductor(Sq.cm)
+cost_line = 12000.0+8000*a // Cost of line including erection(Rs/km)
+R = 0.19/a // Resistance per km of each conductor(ohm)
+cost_energy = 8.0/100 // Energy cost(Rs/unit)
+interest_per = 0.1 // Interest & depreciation. Assumption
+
+// Calculations
+annual_charge = interest_per*cost_line // Total annual charge(Rs)
+I_1 = l_1/(3**0.5*V*PF) // Line current for load 1(A)
+I_2 = l_2/(3**0.5*V*PF) // Line current for load 2(A)
+I_3 = l_3/(3**0.5*V*PF) // Line current for load 3(A)
+I_2_t = I_1**2*t_1+I_2**2*t_2+I_3**2*t_3 // I^2*t
+annual_energy = 3.0*R*365/1000*I_2_t // Annual energy consumption on account of losses(kWh)
+cost_waste = annual_energy*cost_energy // Cost of energy wasted per annum(Rs)
+area = (2888.62809917355/800.0)**0.5 // Economical cross-section = a(Sq.cm). Simplified and taken final answer
+
+// Results
+disp("PART II - EXAMPLE : 17.7 : SOLUTION :-")
+printf("\nMost economical cross-section, a = %.2f cm^2", area)