diff options
author | prashantsinalkar | 2018-02-03 11:01:52 +0530 |
---|---|---|
committer | prashantsinalkar | 2018-02-03 11:01:52 +0530 |
commit | 7bc77cb1ed33745c720952c92b3b2747c5cbf2df (patch) | |
tree | 449d555969bfd7befe906877abab098c6e63a0e8 /3886/CH16/EX16.9/16_9.sce | |
parent | d1e070fe2d77c8e7f6ba4b0c57b1b42e26349059 (diff) | |
download | Scilab-TBC-Uploads-master.tar.gz Scilab-TBC-Uploads-master.tar.bz2 Scilab-TBC-Uploads-master.zip |
Diffstat (limited to '3886/CH16/EX16.9/16_9.sce')
-rw-r--r-- | 3886/CH16/EX16.9/16_9.sce | 16 |
1 files changed, 16 insertions, 0 deletions
diff --git a/3886/CH16/EX16.9/16_9.sce b/3886/CH16/EX16.9/16_9.sce new file mode 100644 index 000000000..9dcdf4232 --- /dev/null +++ b/3886/CH16/EX16.9/16_9.sce @@ -0,0 +1,16 @@ +//Force P required
+//refer fig. 16.13 (a),(b)
+//The system of forces acting on connecting bodies is shown in figure
+N1=250 //N
+mu=0.3
+F1=mu*N1 //N
+N2=(1000*3)/(5) //N
+F2=0.3*N2 //N
+N3=500 //N
+F3=mu*N3 //N
+//Let the constant force be P
+//writing work energy equation
+P=((250+1000+500)*3*3/(2*9.81*4.5))+75+180+1000*0.8+150 //N
+printf("\nThus P=%.3f N",P)
+
+
|