diff options
author | prashantsinalkar | 2017-10-10 12:27:19 +0530 |
---|---|---|
committer | prashantsinalkar | 2017-10-10 12:27:19 +0530 |
commit | 7f60ea012dd2524dae921a2a35adbf7ef21f2bb6 (patch) | |
tree | dbb9e3ddb5fc829e7c5c7e6be99b2c4ba356132c /3472/CH7/EX7.4 | |
parent | b1f5c3f8d6671b4331cef1dcebdf63b7a43a3a2b (diff) | |
download | Scilab-TBC-Uploads-7f60ea012dd2524dae921a2a35adbf7ef21f2bb6.tar.gz Scilab-TBC-Uploads-7f60ea012dd2524dae921a2a35adbf7ef21f2bb6.tar.bz2 Scilab-TBC-Uploads-7f60ea012dd2524dae921a2a35adbf7ef21f2bb6.zip |
initial commit / add all books
Diffstat (limited to '3472/CH7/EX7.4')
-rw-r--r-- | 3472/CH7/EX7.4/Example7_4.sce | 26 |
1 files changed, 26 insertions, 0 deletions
diff --git a/3472/CH7/EX7.4/Example7_4.sce b/3472/CH7/EX7.4/Example7_4.sce new file mode 100644 index 000000000..f61f3e733 --- /dev/null +++ b/3472/CH7/EX7.4/Example7_4.sce @@ -0,0 +1,26 @@ +// A Texbook on POWER SYSTEM ENGINEERING
+// A.Chakrabarti, M.L.Soni, P.V.Gupta, U.S.Bhatnagar
+// DHANPAT RAI & Co.
+// SECOND EDITION
+
+// PART I : GENERATION
+// CHAPTER 7: TARIFFS AND ECONOMIC ASPECTS IN POWER GENERATION
+
+// EXAMPLE : 7.4 :
+// Page number 74
+clear ; clc ; close ; // Clear the work space and console
+
+// Given data
+MD = 500.0 // Maximum demand(MW)
+LF = 0.5 // Annual load factor
+CF = 0.4 // Annual capacity factor
+
+// Calculations
+hours_year = 365.0*24 // Total hours in a year
+energy_gen = MD*LF*hours_year // Energy generated/annum(MWh)
+plant_cap = energy_gen/(CF*hours_year) // Plant capacity(MW)
+reserve_cap = plant_cap-MD // Reserve capacity of plant(MW)
+
+// Results
+disp("PART I - EXAMPLE : 7.4 : SOLUTION :-")
+printf("\nReserve capacity of plant = %.f MW", reserve_cap)
|