Increase in cost for unit 1 is = 772.5 Rs/hr Increase in cost for unit 2 is = -721.875 Rs/hr Net saving caused by optimum scheduling is = 50.625 Rs/hr Total yearly saving assuming continuous operation= Rs 443474