//Electric Power Generation, Transmission and Distribution by S.N.Singh //Publisher:PHI Learning Private Limited //Year: 2012 ; Edition - 2 //Example 4.2 //Scilab Version : 6.0.0 ; OS : Windows clc; clear; max_demand=100; //Maximum demand of generating station in MW LF=0.65; //Load factor of generating station in percentage PCF=0.50; //Plant capacity factor of generating station in percentage PUF=0.80; //Plant use factor of generating station in percentage avg_demand=max_demand*LF; //Average demand of generating station in MW daily_energy=avg_demand*24; //Daily energy produced by generating station in MWh PRC=avg_demand/PCF; //Plant rated capacity of generating station in MW RC=PRC-max_demand; //Reserve capacity of generating station in MW max_energy=PRC*24; //Maximum energy produced if plant is running all the time in MWh FL_max_energy=daily_energy/PUF; //Maximum energy produced if plant is running at full load in MWh UF=max_demand/PRC; //Utilization factor of generating station printf("\nDaily energy produced %.f MWh",daily_energy); printf("\nInstalled capacity of plant %.f MW",PRC); printf("\nReserve capacity of plant %.f MW",RC); printf("\nMaximum energy that could be produced if the plant is running all the time %.f MWh",max_energy); printf("\nMaximum energy that could be produced if the plant is running at full load %.f MWh",FL_max_energy); printf("\nUtilization factor %.3f",UF);