// Example 35_5 clc;funcprot(0); //Given data T=[0 10 20 30 40 50 60 70 80 90 100];// Percentage time of a year L=[36.0 33.2 33 29.8 29.6 29.2 28.5 28.0 22.0 12.0 8.0];// Load in MW // C_1=48 kW+0.03 kWh // C_2=36 kW+0.035 kWh L_b=32;// MW L_p=7;// MW A_1=48; A_2=36; B_1=0.030; B_2=0.035; t=8760;// hours MD=L(1);// MW // Calculation xlabel('TIME IN PERCENT OF YEAR'); ylabel('LOAD IN MW'); xtitle('Fig.Prob.35.5'); plot(T,L,'r'); legend('Load duration curve'); L=(A_1-A_2)/(B_2-B_1);// Time in hours T=(L/t)*100;// % of a year // From Fig.Prob.35.5, P_b=30;// MW P_p=MD-P_b;// MW A_b=12.38;// cm^2 A_p=0.38;// cm^2 x=20;// Percentage of time y=10*10^3;// kW // For base load plant Q_b=A_b*((x/100)*t)*y;// kWh LF_b=(Q_b/(P_b*10^3*t))*100;// Load factor CF_b=(Q_b/(L_b*10^3*t))*100;// Capacity factor UF_b=(CF_b/LF_b)*100;// Use factor // For peak load plant Q_p=A_p*((x/100)*t)*y;// kWh LF_p=(Q_p/(P_p*10^3*t))*100;// Load factor CF_p=(Q_p/(L_p*10^3*t))*100;// Capacity factor UF_p=(CF_p/LF_p)*100;// Use factor printf('\nFor Base load plant:Load factor=%0.1f percentage \n Capacity factor=%0.0f percentage \n Use factorr=%0.1f percentage \nFor peak load plant:Load factor=%0.2f percentage \n Capacity factor=%0.3f percentage \n Use factor=%0.2f percentage',LF_b,CF_b,UF_b,LF_p,CF_p,UF_p); // The answer vary due to round off error