// A Texbook on POWER SYSTEM ENGINEERING // A.Chakrabarti, M.L.Soni, P.V.Gupta, U.S.Bhatnagar // DHANPAT RAI & Co. // SECOND EDITION // PART I : GENERATION // CHAPTER 7: TARIFFS AND ECONOMIC ASPECTS IN POWER GENERATION // EXAMPLE : 7.22 : // Page number 82 clear ; clc ; close ; // Clear the work space and console // Given data MD = 20.0*10**3 // Maximum demand(kW) LF = 0.6 // Load factor CF = 0.48 // Plant capacity factor UF = 0.8 // Plant use factor // Calculations // Case(a) avg_demand = LF*MD // Average demand(kW) ene_daily = avg_demand*24.0 // Daily energy produced(kWh) // Case(b) cap_installed = avg_demand/CF // Installed capacity(kW) cap_reserve = cap_installed-MD // Reserve capacity(kW) // Case(c) max_ene_C = cap_installed*24.0 // Maximum energy that could be produced daily(kWh) // Case(d) max_ene_D = ene_daily/UF // Maximum energy that could be produced daily as per schedule(kWh) // Results disp("PART I - EXAMPLE : 7.22 : SOLUTION :-") printf("\nCase(a): Daily energy produced = %.f kWh", ene_daily) printf("\nCase(b): Reserve capacity of plant = %.f kW", cap_reserve) printf("\nCase(c): Maximum energy that could be produced daily when plant runs at all time = %.f kWh", max_ene_C) printf("\nCase(d): Maximum energy that could be produced daily when plant runs fully loaded = %.f kWh", max_ene_D)