// A Texbook on POWER SYSTEM ENGINEERING // A.Chakrabarti, M.L.Soni, P.V.Gupta, U.S.Bhatnagar // DHANPAT RAI & Co. // SECOND EDITION // PART I : GENERATION // CHAPTER 7: TARIFFS AND ECONOMIC ASPECTS IN POWER GENERATION // EXAMPLE : 7.12 : // Page number 76-77 clear ; clc ; close ; // Clear the work space and console // Given data cap_installed = 500.0 // Installed capacity of the station(MW) CF = 0.45 // Capacity factor LF = 0.6 // Annual laod factor cost_fueloil = 10.0*10**7 // Annual cost of fuel,oil etc(Rs) capital_cost = 10**9 // Capital cost(Rs) interest = 0.15 // Interest and depreciation // Calculations // Case(i) MD = cap_installed*CF/LF // Maximum demand(MW) cap_reserve = cap_installed-MD // Reserve capacity(MW) // Case(ii) hours_year = 365.0*24 // Total hours in a year units_gen = MD*10**3*LF*hours_year // Units generated per annum(kWh) fixed_charge = interest*capital_cost // Annual fixed charges(Rs) running_charge = cost_fueloil // Annual running charges(Rs) annual_charge = fixed_charge+running_charge // Total annual charges(Rs) cost_unit = annual_charge*100/units_gen // Cost per kWh generated(Paise) // Results disp("PART I - EXAMPLE : 7.12 : SOLUTION :-") printf("\nCase(i) : Minimum reserve capacity of station = %.f MW", cap_reserve) printf("\nCase(ii): Cost per kWh generated = %.f paise", cost_unit)