//exa 2.13 clc;clear;close; format('v',10); //C1=2000+20*P1+0.05*P1^2;//Rs./hour //C2=2750+26*P2+0.03091*P2^2;//Rs./hour P1=350;//MW P2=550;//MW C1=2000+20*P1+0.05*P1^2;//Rs./hour C2=2750+26*P2+0.03091*P2^2;//Rs./hour C=C1+C2;//Rs./hour disp(C,"(a) Total Cost(Rs./hour)"); P=P1+P2;//MW//Total Load P1=poly(0,'P1'); P2=poly(0,'P2'); dC1bydP1=20+2*0.05*P1; dC2bydP2=26+2*0.03091*P2; disp("(b) For Economic Scheduling") format('v',7); //dC1/dP1=dC2/dP2 for economic sheduling //Let loads of unit are P1 & P-P1 eqn=20+2*0.05*P1-26-2*0.03091*(P-P1); P1=roots(eqn);//MW P2=P-P1;//MW disp(P2,P1,"Loads P1 & P2 in MW are : "); C1=2000+20*P1+0.05*P1^2;//Rs./hour C2=2750+26*P2+0.03091*P2^2;//Rs./hour Cnew=C1+C2;//Rs./hour disp(Cnew,"Total Cost(Rs./hour)"); saving=C-Cnew;//Rs./hour disp(saving,"Total saving(Rs./hour)"); format('v',5); Lt=P1-350;//MW//Tie line load disp(Lt,"Tie line load from Plant1 to Plant2(MW) : ");