From b1f5c3f8d6671b4331cef1dcebdf63b7a43a3a2b Mon Sep 17 00:00:00 2001 From: priyanka Date: Wed, 24 Jun 2015 15:03:17 +0530 Subject: initial commit / add all books --- 764/CH7/EX7.18.b/result7_18.txt | 100 ++++++++++++++++++++++++++++++++++++++++ 1 file changed, 100 insertions(+) create mode 100755 764/CH7/EX7.18.b/result7_18.txt (limited to '764/CH7/EX7.18.b/result7_18.txt') diff --git a/764/CH7/EX7.18.b/result7_18.txt b/764/CH7/EX7.18.b/result7_18.txt new file mode 100755 index 000000000..4b35b6c3a --- /dev/null +++ b/764/CH7/EX7.18.b/result7_18.txt @@ -0,0 +1,100 @@ +-->//(Threaded Joints) Example 7.18 + +-->//Refer Fig.7.35 on page 256 + +-->//Maximum force acting on the assembly Pmax (kN) + +-->Pmax = 10 + Pmax = + + 10. + +-->//Minimum force acting on the assembly Pmin (kN) + +-->Pmin = 0 + Pmin = + + 0. + +-->//Yield tensile strength of 45C8 Syt (N/mm2) + +-->Syt = 380 + Syt = + + 380. + +-->//Ultimate tensile strength of 45C8 Sut (N/mm2) + +-->Sut = 630 + Sut = + + 630. + +-->//Young's modulus of the plain carbon steel E1 (N/mm2) + +-->E1 = 207000 + E1 = + + 207000. + +-->//Young's modulus of aluminium E2 (N/mm2) + +-->E2 = 71000 + E2 = + + 71000. + +-->//Fatigue stress concentration factor Kf + +-->Kf = 2.2 + Kf = + + 2.2 + +-->//Expected reliability (%) + +-->reliability = 90 + reliability = + + 90. + +-->//Initial pre-load in the bolt Pi (kN) + +-->Pi = 5 + Pi = + + 5. + +-->//Factor of safety fs + +-->fs = 2 + fs = + + 2. + +-->//Length of the bolt l (mm) + +-->l = 25 + 25 + l = + + 50. + +-->//Assume diameter of the bolt to be less than 7.5mm for Kb to be 1 + +-->d = 1 + d = + + 1. + +-->//As Ka is incorporated into Kf, assume the assembly to be ground + +-->//This is just to obtain a random value of Ka + +-->op = 1 + op = + + 1. + + +Core cross-section area of the bolt(A) = 54.133961 mm2 + \ No newline at end of file -- cgit