From 7bc77cb1ed33745c720952c92b3b2747c5cbf2df Mon Sep 17 00:00:00 2001 From: prashantsinalkar Date: Sat, 3 Feb 2018 11:01:52 +0530 Subject: Added new code --- 3888/CH6/EX6.1/Ex6_1.JPG | Bin 0 -> 15983 bytes 3888/CH6/EX6.1/Ex6_1.sce | 25 +++++++++++++++++++++++++ 2 files changed, 25 insertions(+) create mode 100644 3888/CH6/EX6.1/Ex6_1.JPG create mode 100644 3888/CH6/EX6.1/Ex6_1.sce (limited to '3888/CH6/EX6.1') diff --git a/3888/CH6/EX6.1/Ex6_1.JPG b/3888/CH6/EX6.1/Ex6_1.JPG new file mode 100644 index 000000000..a22aa5f5e Binary files /dev/null and b/3888/CH6/EX6.1/Ex6_1.JPG differ diff --git a/3888/CH6/EX6.1/Ex6_1.sce b/3888/CH6/EX6.1/Ex6_1.sce new file mode 100644 index 000000000..cc70f44da --- /dev/null +++ b/3888/CH6/EX6.1/Ex6_1.sce @@ -0,0 +1,25 @@ +//Electric Power Generation, Transmission and Distribution by S.N.Singh +//Publisher:PHI Learning Private Limited +//Year: 2012 ; Edition - 2 +//Example 6.1 +//Scilab Version : 6.0.0 ; OS : Windows + +clc; +clear; + + +reser_catch_area=50; //Catchment area of reservoir in km^2 +avg_rainfall=150; //Average rainfall in cm/year +station_head=40; //Mean head of station in m +UF=0.75; //Utilization factor +LF=0.75; //Load factor +tur_eff=0.88; //Efficiency of turbine +gen_eff=0.93; //Efficiency of generator +water_volume=reser_catch_area*10^6*1.5*UF; //Available water for electricity production in m^3 +Q=water_volume/(365*24*60*60); //Available quantity in m^3/sec +P=(0.736/75)*Q*1000*station_head*tur_eff*gen_eff; //Power of station in kW +install_cap_gen=P/LF; //Generator installed capacity in kW + +printf("\nThe power is %.2f kW",P); +printf("\nInstalled capacity of the generator is %.f kW",install_cap_gen); + //variation present in result due to wrong calculation of Q value -- cgit