From 7f60ea012dd2524dae921a2a35adbf7ef21f2bb6 Mon Sep 17 00:00:00 2001 From: prashantsinalkar Date: Tue, 10 Oct 2017 12:27:19 +0530 Subject: initial commit / add all books --- 3472/CH33/EX33.2/Example33_2.sce | 27 +++++++++++++++++++++++++++ 1 file changed, 27 insertions(+) create mode 100644 3472/CH33/EX33.2/Example33_2.sce (limited to '3472/CH33/EX33.2/Example33_2.sce') diff --git a/3472/CH33/EX33.2/Example33_2.sce b/3472/CH33/EX33.2/Example33_2.sce new file mode 100644 index 000000000..6ba042a37 --- /dev/null +++ b/3472/CH33/EX33.2/Example33_2.sce @@ -0,0 +1,27 @@ +// A Texbook on POWER SYSTEM ENGINEERING +// A.Chakrabarti, M.L.Soni, P.V.Gupta, U.S.Bhatnagar +// DHANPAT RAI & Co. +// SECOND EDITION + +// PART III : SWITCHGEAR AND PROTECTION +// CHAPTER 7: PROTECTIVE RELAYS + +// EXAMPLE : 7.2 : +// Page number 596 +clear ; clc ; close ; // Clear the work space and console + +// Given data +ratio = 525.0/1 // CT ratio +CT_sec = 1.0 // Secondary turn +t_mult = 0.3 // Time multiplier setting +I_f = 5250.0 // Fault current(A) + +// Calculations +I_sec_fault = I_f/ratio // Secondary fault current(A) +PSM = I_sec_fault/(1.25*CT_sec) // Plug setting multiplier +t = 3.15 // Time against this PSM(sec). From graph E7.1 in textbook page no 595 +time_oper = t*t_mult // Operating time(sec) + +// Results +disp("PART III - EXAMPLE : 7.2 : SOLUTION :-") +printf("\nTime of operation of the relay = %.3f sec", time_oper) -- cgit