@@ -0,0 +1,143 @@
+//A practical problem of factory planning which determines the optimum product
+// mix subject to production capacity and marketing limitation.
+//This example shows how to use spreadsheet data directly in scilab.
+//Ref: H. Paul Williams ,Model Building in Mathematical Programming ,
+//A John Wiley & Sons, Ltd., Publication, Fifth Ed, Chapter 12.
+//
+//Example: An engineering factory makes seven products (PROD 1 to PROD 7) on the
+//following machines: four grinders, two vertical drills, three horizontal drills, one
+//borer and one planer. Each product yields a certain contribution to profit (defined
+//as £/unit selling price minus cost of raw materials). These quantities (in £/unit)
+//together with the unit production times (hours) required on each process are given
+//below. A dash indicates that a product does not require a process.
+//---------------------------------------------------------------------------------------
+// Prod 1 Prod 2 Prod 3 Prod 4 Prod 5 Prod 6 Prod 7
+//
+//Contribution to profit 10 6 8 4 11 9 3
+//Grinding 0.5 0.7 - - 0.3 0.2 0.5
+//Vertical drilling 0.1 0.2 - 0.3 - 0.6 -
+//Horizontal drilling 0.2 - 0.8 - - - 0.6
+//Boring 0.05 0.03 - 0.07 0.1 - 0.08
+//Planing - - 0.01 - 0.05 - 0.05
+//--------------------------------------------------------------------------------------
+//In the present month (January) and the five subsequent months, certain
+//machines will be down for maintenance. These machines will be as follows:
+//--------------------------------------------
+//January 1 Grinder
+//February 2 Horizontal drills
+//March 1 Borer
+//April 1 Vertical drill
+//May 1 Grinder and 1 Vertical drill
+//June 1 Planer and 1 Horizontal drill
+//--------------------------------------------
+//
+//There are marketing limitations on each product in each month. These are
+//given in the following table:
+//-------------------------------------------
+// 1 2 3 4 5 6 7
+//-------------------------------------------
+//January 500 1000 300 300 800 200 100
+//February 600 500 200 0 400 300 150
+//March 300 600 0 0 500 400 100
+//April 200 300 400 500 200 0 100
+//May 0 100 500 100 1000 300 0
+//June 500 500 100 300 1100 500 60
+//-------------------------------------------
+//
+//The factory works at six days a week with two shifts of 8 h each day.
+//When and what should the factory make in order to maximise the total profit?
+//This problem considers single period only with no storage
+
+// Copyright (C) 2018 - IIT Bombay - FOSSEE
+// This file must be used under the terms of the CeCILL.
+// This source file is licensed as described in the file COPYING, which
+// you should have received as part of this distribution. The terms
+// are also available at
+// http://www.cecill.info/licences/Licence_CeCILL_V2-en.txt
+// Author:Debasis Maharana
+// Organization: FOSSEE, IIT Bombay
+// Email: toolbox@scilab.in
+//=================================================================================
+clc
+
+filepath = 'C:\Users\Iball\Desktop\scilab problems\Date 21-05-2018-Debasis\factory.xls';
+[fd,SST,Sheetnames,Sheetpos] = xls_open(filepath);
+S = readxls(filepath);
+[Contributation,TextInd] = xls_read(fd,Sheetpos(Sheetnames == 'Contributation')); //Sheetpos gives the position of all the sheets
+[Available,TextInd] = xls_read(fd,Sheetpos(Sheetnames == 'Available'));
+[Failure,TextInd] = xls_read(fd,Sheetpos(Sheetnames == 'Machine Failure'));
+[Limitation,TextInd] = xls_read(fd,Sheetpos(Sheetnames == 'Limitation'));
+mclose(fd) //close the file
+
+Sheetdata = readxls(filepath);
+mprintf('Problem Data received\n')
+for i = 1:4
+ disp(Sheetnames(i))
+ disp(Sheetdata(i))
+end
+input('press enter to continue')
+clc
+mprintf('Scilab is solving your problem')
+Shift_T = 8;N_shift = 2;N_Workingdys = 24;//Data is fixed according to example. However it can be made as user defined parameter
+
+Wrk_hrs = Shift_T*N_shift*N_Workingdys;
+
+[Nmonth,Nprod] = size(Limitation);
+
+Nprod = Nprod - 1;
+Nmonth = Nmonth - 1;
+Ntype = size(Available,'r');
+
+Available = Available(:,2);
+
+Contributation = Contributation(2:Ntype+2,2:Nprod+1);// Extracting the data matrix only
+Limitation = Limitation(2:Nmonth+1,2:Nprod+1);
+Failure = Failure(2:Nmonth+1,2:Ntype+1);
+Failure(isnan(Failure))=0;
+
+ub = [];
+for i = 1:Ntype
+ Amonth(i,:) = Contributation(i+1,:);
+ breq(i) = Available(i)*Wrk_hrs;
+end
+b = [];A = zeros(Nmonth*Ntype,Nmonth*Nprod);C = [];lb = zeros(1,Nmonth*Nprod);
+
+// Instead of seperate loops, we can use a single loop for determining all the possible variables
+for i = 1:Nmonth
+ A((i-1)*Ntype+1:i*Ntype,(i-1)*Nprod+1:i*Nprod) = Amonth;
+ B_month = breq - (Failure(i,:))'*Wrk_hrs;
+ b = [b;B_month];
+ C = [C;-Contributation(1,:)'];
+ ub = [ub Limitation(i,:)];
+end
+
+intcon = 1:Nmonth*Nprod; // all production units are integers
+options = list("time_limit", 2500);
+[xopt,fopt,status,output] = symphonymat(C,intcon,A,b,[],[],lb,ub,options);
+clc
+select status
+case 227 then
+ mprintf('Optimal Solution Found')
+case 228 then
+ mprintf('Maximum CPU Time exceeded')
+case 229 then
+ mprintf('Maximum Number of Node Limit Exceeded')
+else
+ mprintf('Maximum Number of Iterations Limit Exceeded')
+end
+input('Press enter to view results')
+// Solution representation
+A2 = ['January','Februry','March','April','May','June']';// users can modify it to accept from the excel sheet
+A1 = [" ", 'Prod1','Prod2','Prod3','Prod4','Prod5','Prod6','Prod7'];
+
+for i = 1:Nmonth
+ solution(i,:) = string(xopt((i-1)*Nprod+1:i*Nprod)');
+end
+
+mprintf('Production schedule for all the months')
+
+table = [A1;[A2 solution]];
+disp(table)
+mprintf('The profit is %d',-fopt)
+
+