1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
|
// Check for size of upper bound of constraints
// A basic case :
// Objective function
c = [350*5,330*3,310*4,280*6,500,450,400,100]';
// Lower Bound of variable
lb = repmat(0,8,1);
// Upper Bound of variables
ub = [repmat(1,4,1);repmat(%inf,4,1)];
// Constraint Matrix
A = [5,3,4,6,1,1,1,1;
5*0.05,3*0.04,4*0.05,6*0.03,0.08,0.07,0.06,0.03;
5*0.03,3*0.03,4*0.04,6*0.04,0.06,0.07,0.08,0.09;]
// Lower Bound of constrains
conlb = [ 25; 1.25; 1.25]
// Upper Bound of constrains
conub = [ 25; 1.25;]
// Row Matrix for telling symphony that the is integer or not
isInt = [repmat(%t,1,4) repmat(%f,1,4)];
// Error
//Symphony: The Upper Bound of constraint is not equal to the number of constraint
//at line 232 of function symphony called by :
//[x,f,status,output] = symphony(8,3,c,isInt,lb,ub,A,conlb,conub,1)
// Calling Symphony
[x,f,status,output] = symphony(8,3,c,isInt,lb,ub,A,conlb,conub,1)
|