// Check for size of upper bound of constraints // A basic case : // Objective function c = [350*5,330*3,310*4,280*6,500,450,400,100]'; // Lower Bound of variable lb = repmat(0,8,1); // Upper Bound of variables ub = [repmat(1,4,1);repmat(%inf,4,1)]; // Constraint Matrix A = [5,3,4,6,1,1,1,1; 5*0.05,3*0.04,4*0.05,6*0.03,0.08,0.07,0.06,0.03; 5*0.03,3*0.03,4*0.04,6*0.04,0.06,0.07,0.08,0.09;] // Lower Bound of constrains conlb = [ 25; 1.25; 1.25] // Upper Bound of constrains conub = [ 25; 1.25;] // Row Matrix for telling symphony that the is integer or not isInt = [repmat(%t,1,4) repmat(%f,1,4)]; // Error //Symphony: The Upper Bound of constraint is not equal to the number of constraint //at line 232 of function symphony called by : //[x,f,status,output] = symphony(8,3,c,isInt,lb,ub,A,conlb,conub,1) // Calling Symphony [x,f,status,output] = symphony(8,3,c,isInt,lb,ub,A,conlb,conub,1)